
Maroon and black. 10 minutes, figure 1.
Shading, contour lines, color in sky, sign, awning, and window, figure 2.

Next I will refine the sign lettering, and soffit around the grey doors in the foreground. Also, a faded sign painted upon the building is repaired. It’s missing a triangle just at the lower right of the Buzzy’s sign.
This is the building next door:


I just need to adjust the two signs- the hanging and the painted ones, figure 3. Going to degrade the painted one, improve the lettering on the hanging one.
